Kirtlington C of E Primary

Client
Kirtlington C of E Primary School

Location
Oxfordshire

Date
March 2019

Home > Our Projects > Kirtlington C of E Primary

A transformation for a village school in Oxfordshire

Kirtlington primary contacted us in the summer of 2018 with a view to redeveloping the nursery and reception play area of their school. The school is located within a very pretty village in the heart of Oxfordshire and their outdoor space is surrounded by trees and our design fullfills the wishes of the school through the provision of a natural scheme that compliments the surrounding beauty. After the removal of multiple pieces of old equipment we installed several elements encouraging physical play including a new robinia climbing trail and a landscaped play hill with tunnel. Both features were surrounded in our mulch safety surfacing.
The final product

A similar project to this would cost £31,000

We also provided in the design a beautiful den with mirrors and seating in addition to several den building kits inspiring imaginative and role based play. Areas for pebble and sand play area also featured within the design. The result was an amazing transformation from a tired, hard to manage play space to a stimulating, well zoned play and learning environment.

Build your perfect playground

Get in touch now to arrange your free no obligation survey, design and quotation and discover how we can transform your playspace.

give us a call

Our office hours are 8am – 4.30pm, Monday to Friday. Just call 01435 812484